Qualcomm P collaborated with A.O. Reed & Co. to enhance the efficiency of their 1.7 MW data center for expansion and reliable operation.
A.O. Reed managed the mechanical and plumbing upgrades in this design-assist project.
The project included unique design characteristics to meet Qualcomm’s needs:
The project included the design of two new single-story CMU buildings. To adequately back up in case of mechanical failure, the team added a thermal storage tank to support the 500-ton air cooled backup chiller in the main central plant.
In addition, the team installed: