Qualcomm P New Data Center

Case study
Data Centers

Qualcomm Powers Up Data Center Expansion with Efficient Design

Qualcomm P collaborated with A.O. Reed & Co. to enhance the efficiency of their 1.7 MW data center for expansion and reliable operation.

A.O. Reed managed the mechanical and plumbing upgrades in this design-assist project.

Customer Needs

The project included unique design characteristics to meet Qualcomm’s needs:

  • Additional data space
  • Cooling backup contingencies
Key Strategies Implemented

The project included the design of two new single-story CMU buildings. To adequately back up in case of mechanical failure, the team added a thermal storage tank to support the 500-ton air cooled backup chiller in the main central plant.

In addition, the team installed:

  • 48 in-row cooling units capable of operating with inlet water of 61 degrees
  • 12,000-gallon tanks
  • Rooftop package cooling units
  • Rooftop dehumidification units
  • Floor drains
  • Industrial water
MEP Contracting
Impact
Location
San Diego, CA
project size
4,783 SF
Year Completed
2020
Awards
Energy Savings
Quote

Latest News

Recent news.

Press Release
9.10.24
Legence Partners with BuildOps to Revolutionize MEP Services
Press Release
8.14.24
Legence Acquires New York City-Based AMA Group for Strategic Partnership with CMTA to Deliver New Technology and Engineering Services Nationwide
Article
8.14.24
Blackstone Subsidiary Legence Acquiring Engineering Firm AMA Group
Insights

Explore our latest thinking.

Information on energy efficiency, building decarbonization, energy policy and the people behind the energy transition.
Learn More