CMTA conducted an investment-grade audit of Mohegan Sun Arena, identifying energy-saving needs and outdated equipment. Critical upgrades included 73 water source heat pumps, parking lot lighting, and refrigeration systems.
CMTA collaborated with the engineering team, prioritizing budget and timelines. Using a phased approach, they designed energy-efficient HVAC and refrigeration systems, with ICS managing construction for the project, resulting in $15,870 in annual savings.
CMTA, ICS, and Provident Energy Consulting
To alleviate financial pressure, CMTA secured $2,000,000 in grant funding from the American Rescue Act.
CMTA and ICS utilized a multi-phased approach to accelerate the project. The design comprised three phases:
$15,870 in annual savings